The Ultimate Step-by-Step Guide to Kitchen Remodeling in DFW
- Aizik Kerman
- Mar 23
- 4 min read

The Ultimate Step-by-Step Guide to Kitchen Remodeling in DFW
Remodeling your kitchen is one of the best investments you can make to increase the value of your home. But to ensure a smooth and successful project, it’s crucial to follow the right sequence of steps. At Royal AM Remodeling, the leading design and remodeling company in the DFW area, we guide our clients through a structured remodeling process that minimizes delays and maximizes quality.
Whether you’re planning a full kitchen overhaul or just upgrading key elements, following these steps will help you achieve your dream kitchen efficiently. Here’s a breakdown of the kitchen remodeling process, including estimated timeframes for each phase.
Step 1: Initial Consultation & Design (1-2 Weeks)
The first step is to establish a clear vision. During the initial consultation, our design team discusses your goals, budget, and preferred styles. We analyze your space and explore design possibilities that align with your lifestyle.
Define your needs and must-have features
Define your budget
Select the desired style (modern, farmhouse, traditional, etc.)
Explore layout options (L-shape, U-shape, open-concept)
Timeframe: 1-2 weeks, depending on the complexity of the design.
Step 2: Material Selection (1-5 Days)
Once the design and budget are established its time to choose materials and appliances. We help you select high-quality materials that complement your vision while staying within budget.
Choose and order appliances. Appliances are one of the first steps in any kitchen remodeling. They can define your layout and influence your design theme.
Choose cabinetry, countertops, and backsplash
Select flooring, and fixtures.
Consider lighting and hardware options.
Timeframe: 1-5 Days , depending on material availability and decision-making speed.

Step 3: Permits & Approvals (2-4 Weeks)
Before construction begins, securing the necessary permits is essential. Depending on the extent of the remodel, permits may be required for plumbing, electrical, and structural changes.
Submit plans to local authorities
Obtain necessary permits
Schedule inspections if required
Timeframe: 2-4 weeks, depending on your city’s approval process.
Step 4: Demolition & Prep Work (3-5 Days)
Once permits are in place, it’s time to clear out the existing kitchen. This phase involves removing old cabinets, appliances, flooring, and other elements to prepare the space for the new design.
Shut off utilities and disconnect appliances
Protect surrounding areas from dust and debris
Remove old fixtures, cabinetry, and flooring
Timeframe: 3-5 days, depending on the size and complexity of the space.
Step 5: Plumbing & Electrical Rough-In (1-2 Weeks)
With a clean slate, the next step is to complete the rough-in work for plumbing, and electrical systems. This ensures that everything is properly configured before new walls and flooring go in.
Install/relocate plumbing for sinks and appliances
Rewire electrical outlets, switches, and lighting
Timeframe: 1-2 weeks, depending on the complexity of the systems.
Step 6: Flooring Installation (3-5 Days)
Installing new flooring is a critical step that should be done before cabinetry goes in. Popular options include tile, hardwood, and luxury vinyl plank (LVP), each offering a different aesthetic and durability.
Prepare the subfloor for installation
Lay down selected flooring material
Allow time for setting and curing
Timeframe: 3-5 days, depending on material type.
Step 7: Cabinetry & Countertop Installation (1-3 Weeks)
Once the flooring is in place, it’s time to install your new cabinets and countertops. Proper alignment and secure attachment are key to ensuring long-lasting functionality.
Secure base and wall cabinets
Install countertops and backsplashes
Cut and fit sink and appliance openings
Timeframe: 1-3 weeks, depending on the kitchen size and countertop material availability.

Step 8: Painting & Wall Finishes (3-5 Days)
Adding a fresh coat of paint brings the entire design to life. It’s best to complete this step after cabinetry installation to avoid damage.
Prime and paint walls and ceilings
Apply trim and molding finishes
Touch up paint after final installations
Timeframe: 3-5 days, depending on the area size and paint type.
Step 9: Appliance & Fixture Installation (1-3 Days)
Once the major components are installed, it’s time to bring in the appliances, sinks, and light fixtures. This step brings your kitchen remodeling project to life.
Connect appliances and ensure functionality
Install faucets and plumbing fixtures
Mount lighting and hardware
Timeframe: 1-3 days, depending on the complexity of installations.
Step 10: Final Touches & Walkthrough (1-2 Days)
The final step includes a detailed walkthrough to ensure every element is properly installed and functioning. We also make any necessary adjustments and ensure your satisfaction.
Inspect plumbing, electrical, and appliances
Check for imperfections and make corrections
Provide maintenance tips and warranty details
Timeframe: 1-2 days
Estimated Total Timeframe for Kitchen Remodeling: 6-10 Weeks
While the timeline can vary depending on project complexity and material availability, most kitchen remodels take between 6 to 10 weeks to complete.
Why Choose Royal AM Remodeling?
As DFW’s leading kitchen remodeling company, Royal AM Remodeling focuses on delivering design-driven, high-quality transformations that exceed expectations. Our proven process ensures that your remodeling project stays on schedule and within budget.
Expert design consultation tailored to your needs
Access to top-quality materials and brands
Professional project management with minimal disruptions
Ready to transform your kitchen? Contact Royal AM Remodeling today for a consultation and let us bring your dream kitchen to life!