The Ultimate Step-by-Step Guide to Kitchen Remodeling in DFW

  • Writer: Aizik Kerman
    Aizik Kerman
  • Mar 23
  • 4 min read

ree

The Ultimate Step-by-Step Guide to Kitchen Remodeling in DFW

Remodeling your kitchen is one of the best investments you can make to increase the value of your home. But to ensure a smooth and successful project, it’s crucial to follow the right sequence of steps. At Royal AM Remodeling, the leading design and remodeling company in the DFW area, we guide our clients through a structured remodeling process that minimizes delays and maximizes quality.

Whether you’re planning a full kitchen overhaul or just upgrading key elements, following these steps will help you achieve your dream kitchen efficiently. Here’s a breakdown of the kitchen remodeling process, including estimated timeframes for each phase.




Step 1: Initial Consultation & Design (1-2 Weeks)

The first step is to establish a clear vision. During the initial consultation, our design team discusses your goals, budget, and preferred styles. We analyze your space and explore design possibilities that align with your lifestyle.

  • Define your needs and must-have features

  • Define your budget

  • Select the desired style (modern, farmhouse, traditional, etc.)

  • Explore layout options (L-shape, U-shape, open-concept)

Timeframe: 1-2 weeks, depending on the complexity of the design.



Step 2: Material Selection (1-5 Days)

Once the design and budget are established its time to choose materials and appliances. We help you select high-quality materials that complement your vision while staying within budget.

  •  Choose and order appliances. Appliances are one of the first steps in any kitchen remodeling. They can define your layout and influence your design theme.

  •  Choose cabinetry, countertops, and backsplash

  • Select flooring, and fixtures.

  • Consider lighting and hardware options.

Timeframe: 1-5 Days , depending on material availability and decision-making speed.


ree


Step 3: Permits & Approvals (2-4 Weeks)

Before construction begins, securing the necessary permits is essential. Depending on the extent of the remodel, permits may be required for plumbing, electrical, and structural changes.

  • Submit plans to local authorities

  • Obtain necessary permits

  • Schedule inspections if required

Timeframe: 2-4 weeks, depending on your city’s approval process.



Step 4: Demolition & Prep Work (3-5 Days)

Once permits are in place, it’s time to clear out the existing kitchen. This phase involves removing old cabinets, appliances, flooring, and other elements to prepare the space for the new design.

  •  Shut off utilities and disconnect appliances

  • Protect surrounding areas from dust and debris

  • Remove old fixtures, cabinetry, and flooring

Timeframe: 3-5 days, depending on the size and complexity of the space.



Step 5: Plumbing & Electrical Rough-In (1-2 Weeks)

With a clean slate, the next step is to complete the rough-in work for plumbing, and electrical systems. This ensures that everything is properly configured before new walls and flooring go in.

  •  Install/relocate plumbing for sinks and appliances

  • Rewire electrical outlets, switches, and lighting

Timeframe: 1-2 weeks, depending on the complexity of the systems.



Step 6: Flooring Installation (3-5 Days)

Installing new flooring is a critical step that should be done before cabinetry goes in. Popular options include tile, hardwood, and luxury vinyl plank (LVP), each offering a different aesthetic and durability.

  •  Prepare the subfloor for installation

  • Lay down selected flooring material

  • Allow time for setting and curing

Timeframe: 3-5 days, depending on material type.



Step 7: Cabinetry & Countertop Installation (1-3 Weeks)

Once the flooring is in place, it’s time to install your new cabinets and countertops. Proper alignment and secure attachment are key to ensuring long-lasting functionality.

  • Secure base and wall cabinets

  • Install countertops and backsplashes

  • Cut and fit sink and appliance openings

Timeframe: 1-3 weeks, depending on the kitchen size and countertop material availability.


ree


Step 8: Painting & Wall Finishes (3-5 Days)

Adding a fresh coat of paint brings the entire design to life.  It’s best to complete this step after cabinetry installation to avoid damage.

  •  Prime and paint walls and ceilings

  • Apply trim and molding finishes

  • Touch up paint after final installations

Timeframe: 3-5 days, depending on the area size and paint type.



Step 9: Appliance & Fixture Installation (1-3 Days)

Once the major components are installed, it’s time to bring in the appliances, sinks, and light fixtures. This step brings your kitchen remodeling project to life.

  • Connect appliances and ensure functionality

  • Install faucets and plumbing fixtures

  • Mount lighting and hardware

Timeframe: 1-3 days, depending on the complexity of installations.



Step 10: Final Touches & Walkthrough (1-2 Days)

The final step includes a detailed walkthrough to ensure every element is properly installed and functioning. We also make any necessary adjustments and ensure your satisfaction.

  • Inspect plumbing, electrical, and appliances

  • Check for imperfections and make corrections

  • Provide maintenance tips and warranty details

Timeframe: 1-2 days



Estimated Total Timeframe for Kitchen Remodeling: 6-10 Weeks

While the timeline can vary depending on project complexity and material availability, most kitchen remodels take between 6 to 10 weeks to complete.



Why Choose Royal AM Remodeling?

As DFW’s leading kitchen remodeling company, Royal AM Remodeling focuses on delivering design-driven, high-quality transformations that exceed expectations. Our proven process ensures that your remodeling project stays on schedule and within budget.

  •  Expert design consultation tailored to your needs

  • Access to top-quality materials and brands

  • Professional project management with minimal disruptions

Ready to transform your kitchen? Contact Royal AM Remodeling today for a consultation and let us bring your dream kitchen to life!

 